CURRICULUM VITAE

 

 

PERSONAL DETAILS

 

 
NAME                                      :       Abdul Hakeem Mohd. Mahmood Semrina   

PROFESSION                         :       Civil Engineer

NATIONALITY                        :         Jordanian

DATE OF BIRTH                     :         02/03/1961

MARITAL STATUS                  :         Married

ADDRESS                                :         Omani Engineering Consultancy Company

    Post Box No. 462, Salalah - 211

    Sultanate of Oman

TELEPHONE                           :         + 968 292486

 

 

KEY QUALIFICATIONS

Abdul Hakeem has 19 years of experience in construction supervision of integrated multidisciplinary projects for water and power supply utilities and industrial buildings and plants, involving close co-ordination between civil, architectural, mechanical and electrical works.

 

He has worked as site supervision engineer, assistant resident engineer and resident engineer, where he gained special experience in supervising the  construction of Industrial infrastructures includes water storage tanks, pumping stations with associated electro-mechanical and control systems, Desalination plants, water transmission lines and distribution networks, electric sub-stations.     

 

COMPUTER APPLICATIONS

·         AutoCAD

·         STAAD III (Structural Analysis)

·         PRIMAVERA – Project Management & Planning

·         Microsoft Windows

·         Words, Excel & Power Point

·         Microsoft Project

 

EDUCATION

M. Sc. Engg. (Civil) in 1985

 

LANGUAGES SKILLS

     English and Arabic, Excellent in speaking, reading and Writing

 

EXPERIENCE RECORD:

 

TIME                               :  From:  2001 To: Present

EMPLOYER                       :  Omani Engineering Consultancy Co. Salalah, OMAN

POSITION                        :  Project Manager

TYPE OF WORK                 : 

1.      Raysut Hotel at Raysut, Salalah ,Sultanate of Oman. It consists of a 4 Star Hotel with 80 Single and Double Bed Rooms, Gymnasium , Restaurant, , Swimming Pools, Central Air-Conditioning Systems, Irrigation Systems, Water Supply Distribution Systems,  ground  water tank, Pipe Line Works, Treatment Plant, Electro Mechanical Systems, Landscaping Works, Etc.

2.      Samharam Tourist Village, Salalah, S. of Oman It consists of a 4 Star Hotel with 100 chalets with Restaurant building , Exhibition Center , Gymnasium , Swimming pools, Central Air-Conditioning Systems, Irrigation Systems, Water Supply Distribution Systems,  ground  water tank, Pipe Line Works, Treatment Plant, Electro Mechanical Systems, Internal  Road Works, Landscaping Works, Etc.

3.      General Projects :Evaluating Properties , Quantity Surveying works, Evaluation of Tenders and Structural Design for different type of buildings.

                                         

TIME                               :  From:  1998    To: 2000

EMPLOYER                       :  Al Teihoon Trading and Construction CO., OMAN

POSITION                        :  Project Manager

TYPE OF WORK                 : 

Construction of Commercial, Industrial buildings including small Desalination Systems, Sewerage Systems, works includes monitoring execution of all RCC components of framed structures, foundations and erection of steel members for industrial sheds commercial complex and domestic residential buildings with all related basic amenities.

 

TIME                               :  From:  1994    To: 1997

EMPLOYER                       :  Amman Contracting Co. Jordan

POSITION                        :  Site Engineer

TYPE OF WORK                 : 

Construction management for Aqaba city Water Supply Networks, Wastewater Collection Scheme and wastewater Treatment Plant of 7500 m3/day at Aqaba, Jordan.

The project consists of, automatic screening, automatic grit oil, grease removal, aeration system, final settling tank, filters, return sludge screw pump, gravity thickener, decanter room and administration, building diesel generator, transformer and workshop buildings.

 

Responsibilities included:

Construction management for the treatment units, roads and parking areas, landscaping interconnecting pipes including valves and fittings and electrical works. Construction Supervision of Water Supply and Wastewater Collection Networks.

Project management duties including time schedule, progress control system, quality assurance, quality control, progress report and coordinate between suppliers and subcontractors to ensure delivery time, work execution according to time schedule and take action to meet target handing over of all activities.

 

TIME                               :  From:  1991    To: 1993

EMPLOYER                       :  Al Tuwaiti National Cont.Co.   In Yemen Republic.

POSITION                        :  Civil Engineer

TYPE OF WORK                     : 

·      Khaleefa bin Hamood Hospital 300 bed.

·      Central Jail of Yamen.

·      Petrolium Ministry Head office in Sanoa- Yamen Republic

 

Responsibilities included:

Construction supervision for the Buildings, roads and parking areas, landscaping interconnecting pipes including valves and fittings and electrical works.Project management duties including time schedule, progress control system, quality assurance, quality control as per international standards, progress report and coordinate between suppliers and subcontractors to ensure delivery time, work execution according to time schedule and take action to meet target handing over of all activities.

 

TIME                              :   From:  1988    To: 1990

EMPLOYER                      :   Oriental Contracting  Co. Jordan

POSITION                       :   Civil Engineer

TYPE OF WORK                :  

Construction of Al-Albyet University Building

(Phase 2):

Duties include carrying necessary Architectural Design modifications, construction supervision and quantity surveying of Civil, Architectural plumbing and finishing works.

Also including preparation of weekly and monthly progress and conducting progress meetings, checking of monthly invoice, monthly bills, checking of as-built drawings, handling over procedure, conducting material testing at laboratory.

 

TIME                              :   From:  1985 To: 1987

EMPLOYER                      :   Jordan Force, civil Engineering. Jordan

POSITION                       :   Civil Engineer

TYPE OF WORK                :  

Construction of housing units in Amman - Jordan.  The Project consists of Housing Buildings with 8 floors each. Each Building contains booster water pumps and water reservoir on the last floor.  The Project comprises a water supply networks and a gravity sewers network for disposal to the public mains.

 

Execute the concrete skeleton complete form the foundation up to the end with all the related surveying works and all the necessary internal and external finishing works for three buildings.  The finishing works include brick walls and partitions, plastering, floor tiling and glazed tiles for walls, painting, plumping, timber works for doors and windows.